HireFT
Browse JobsHow it worksPricingSuccess Stories
    Back to jobs
    CR

    Crux AI

    Artificial Intelligence

    Data Center Construction Manager

    Palo Alto, United StatesHybridFull-time10+ yrs experiencePosted 1mo ago
    All Crux AI jobs

    Job description

    Built to set the gold standard for integrated AI infrastructure

    Crux AI is a newly formed, U.S.-based integrated AI infrastructure company created to remove the physical and operational constraints on consequential AI ambitions. Crux brings together power, high-density data centers, TPU silicon, networking, orchestration software, and ongoing operations as one integrated system.

    Crux is being capitalized to plan every layer together, develop each one to demanding standards, and operate the whole system with efficiency and reliability. That gives hyperscalers, frontier AI labs, sovereign customers, enterprises, and AI-native companies greater freedom to pursue the AI they are here to create.

    WHAT YOU'LL DO

    You will be the owner's construction leader for Crux data center projects — accountable for safety, quality, schedule milestones, forecast accuracy, and cost through GMP and closeout. You will manage general contractors, key trade partners, and owner-furnished equipment on fast-track, high-density builds and fit-outs, including work inside third-party powered shells. Speed to first power and first cluster is the product; your job is to buy schedule intelligently, protect it ruthlessly, and hand operations a building that commissions clean. You will also help set the construction playbook — contracting strategy, prefabrication approach, reporting cadence — that the next projects inherit.

    In this role, you will:

    • Own onsite execution for one or more projects: safety program, quality program, schedule milestones, and weekly project reporting (financial, schedule, quality) to the executive team.

    • Manage GC and trade partner relationships — buyout, change order negotiation, forecast accuracy, and claims avoidance — and manage tenant-improvement work when building inside partner shells.

    • Track and drive the external dependencies that actually move data center schedules — utility energization, permitting and inspections, easements, long-lead equipment, and GC mobilization — treating each as a gated milestone with its own owner and remedy, not a line buried in the P6.

    • Own owner-furnished equipment through the site: procurement coordination, delivery logistics, storage, installation sequencing, and vendor QA/QC for switchgear, generators, cooling plant, and TPU infrastructure.

    • Run cost discipline the way an owner should: separate elected scope adds (schedule buys, capacity pull-ins) from market-driven cost movement in every forecast, with the decision record to defend both.

    • Drive schedule levers that reduce field labor in constrained markets — prefabricated skids, power modules, and cooling assemblies — and hold designs accountable for field labor content in constructability reviews.

    • Lead the construction-to-commissioning-to-operations handoff: commissioning support through Level 5/IST, punch list burn-down, first-time-right turnover packages, and warranty management in live facilities.

    SIGNALS OF SUCCESS

    After 60 days in this role:

    • You'll have full command of the project: baseline schedule validated with external dependencies flagged and owned, reporting cadence running, safety and quality programs enforced on site, GC relationship reset where needed.

    After 6 months:

    • You have milestones tracking to forecast with variances explained in elected-versus-market terms; OFE flowing to site on sequence; commissioning plan integrated with ops acceptance criteria; zero recordable-incident trend.

    After 1 year:

    • You will have the first power and first cluster delivered on or ahead of committed dates; closeout and warranty clean

    • Your project playbook (contracting, prefab, reporting) is adopted as the template for the next builds.

    EXPERIENCES, ATTRIBUTES AND MINDSET THAT INDICATE A GOOD MATCH

    Experiences

    • 10+ years in construction management of large technical projects, including ground-up greenfield delivery, with direct data center experience strongly preferred; deep working knowledge of electrical and mechanical systems, codes, and fire protection.

    • Owner-side or owner’s-rep accountability for safety, quality, schedule, GMP accuracy, and change order negotiation on projects of $250M+

    • Fast-track delivery experience — schedule acceleration decisions, prefabrication strategies, and construction inside or around live/partner facilities.

    Attributes

    • Outcome driven and hands-on leadership. This is a builder’s seat, not a supervisory one. You walk the site, read the contracts, and sit in the schedule sessions — close enough to the work to know when something is off before it shows up in a report.

    • Commercially sharp without being adversarial. You get to fair outcomes on change orders and claims while keeping the GC leaning in — the next project depends on the same market.

    Mindset

    • High tolerance for ambiguity. Design will still be moving, the supply chain will surprise you, and the customer date will not move. You absorb that and convert it into clear near-term direction for the site rather than passing the chaos downstream.

    • Schedule realism over schedule theater. You forecast as a range anchored on external-dependency risk, give early signal on the sites carrying it, and never average bad news into a healthy-looking portfolio number.

    • AI-agentic first. Fluent with AI agents — or committed to becoming so quickly — and you embed them as first principles in how you and your team work, defaulting to agentic workflows before adding headcount or process.

    Nice to have (preferred, not required)

    • High-density AI/HPC build experience (liquid cooling, 100kW+ racks, large UPS/generator plants).

    • Experience delivering fit-outs inside third-party powered shells or colo partner facilities.

    • Procore/ACC/Unifier or similar project controls stack fluency.

    • Commissioning management exposure (Levels 1–5, IST) on mission-critical projects.

    • Experience at a hyperscaler or neocloud during a multi-site construction ramp.

    Salary Range Information

    The annual salary range for this position has been estimated based on market data and other factors. However, a salary higher or lower than this range may be appropriate for a candidate whose qualifications differ meaningfully from those listed in the job description.

    About Crux

    • We offer generous base, bonus and additional incentive based compensation

    • Health, dental, and vision coverage for you and your dependents

    • Company-paid life insurance and disability

    • Full suite of other optional benefits

    • 401(k) Plan with 4% company match

    • Hybrid schedule offering four days in-office collaboration paired with one remote workday for focused, individual work

    Job details are sourced from the employer's original posting.

    Open job posting
    CR

    About the company

    Crux AI

    Built to set the gold standard for integrated AI infrastructure   Crux AI is a newly formed, U.S.-based integrated AI infrastructure company created to remove the physical and operational constraints on the world’s most consequential AI ambitions. Crux will finance, develop, and operate the full chain required to deliver large-scale TPU compute—from power and high-density data centers to silicon, networking, orchestration software, and ongoing operations—as one integrated system.   Those ambitions extend far beyond frontier models. They include faster drug discovery, earlier diagnoses, personalized treatment, mathematical breakthroughs, adaptive education, robotics for disaster response, energy optimization, national security, and data sovereignty. Their progress depends on reliable access to large blocks of accelerated compute—and on the power, facilities, networks, software, and technical expertise required to keep that compute running.   Crux is being capitalized and designed to address these constraints together. Its integrated model supports long-range capacity planning, efficient data center development, optimized TPU clusters, flexible service commitments, and dependable production operations. Crux will serve hyperscalers, frontier AI labs, sovereign and public-sector customers, global enterprises, and AI-native companies through compute-as-a-service and related infrastructure services.   This is the standard Crux is being built to set: every layer planned together, financed for the long term, and operated as one system—giving customers the freedom to focus on the AI they are here to create.

    View all Crux AI jobs
    Industry
    Artificial Intelligence
    Open roles
    36

    Interested in this role?

    Apply with HireFT

    Free to start — no card required.

    Your fit

    How well do you match?

    Sign in to see how your résumé lines up with this role.