HireFT
Browse JobsHow it worksPricingSuccess Stories
    Back to jobs
    HO

    Holder Construction

    Construction

    Scheduling Manager

    Franklin Furnace, United StatesOn-SiteFull-time10+ yrs experiencePosted 4mo ago
    All Holder Construction jobs

    Job description

    ABOUT US

    Holder Construction is a nationally recognized leader in the construction industry, consistently ranked among the top firms on ENR’s Top 400 Contractors list. We are a performance-driven company that believes in rewarding excellence and investing in our people. Our structured career development program empowers associates to grow quickly into expanded roles and responsibilities based on merit. With operations throughout the United States, we offer a highly competitive compensation and benefits package, including:

    • Annual bonus program
    • Paid time off
    • Health, dental, vision, and life insurance
    • 401(k)-retirement plan
    • Night and swing shift differential pay for select roles

    About the Role

    We are looking for a Scheduling Manager to join our Scheduling team in our regional office in Franklin Furnace, OH. This is a full-time, in-person position.

    Key Responsibilities

    • Support the leadership and development of scheduling department tools, training, templates, and resources.
    • Travel as needed to support projects outside the primary office location.
    • Coordinate schedule development and ongoing management with project supervision, owners, and subcontractors/vendors.
    • Build and manage baseline schedules using CPM best practices, including detailed WBS for schedules with 2,500+ activities.
    • Run weekly meetings to update construction schedules via job walks and superintendent live updates.
    • Create, maintain, and edit layouts in Primavera P6 to efficiently update schedules, generate reports, analyze critical paths, and identify variances.
    • Resource-load baseline schedules to track earned value metrics and maintain cost and duration accuracy.
    • Create Time Impact Analysis (TIA) reports and work with project teams to develop mitigation plans.
    • Use Excel to analyze large data sets and multiple schedules.
    • Mentor, train, and assist others in the scheduling process to ensure CPM best practices are implemented consistently.

    Qualifications

    Required:

    • 10+ years in commercial construction management, with at least 5+ years creating and managing CPM schedules (title “Scheduler” not required).
    • “Builder First” attitude and proficiency as a CPM Scheduler.
    • Outstanding written and verbal communication, interpersonal, and time management skills.
    • Familiarity with the construction process to identify and discuss potential issues and suggest mitigations.
    • Ability to work with minimal supervision.
    • Experience coordinating schedule development and management with project teams, owners, and subcontractors/vendors.
    • Ability to work collaboratively in large team environments and mentor junior schedulers.
    • Highly proficient in Primavera P6 or Microsoft Project, with willingness to become proficient in both.
    • Ability to juggle demands from multiple project teams, set priorities, and manage expectations.

    Holder is committed to Equal Opportunity Employment (EOE).

    ​Substance abuse testing and a background screening is a condition of employment and Holder Construction does not sponsor applicants for immigration status or benefits.

    Job details are sourced from the employer's original posting.

    Open job posting
    HO

    About the company

    Holder Construction

    Holder Construction is a leading construction company that provides a wide range of services, including preconstruction, construction, and post-construction support. They are known for their expertise in various sectors, including commercial, healthcare, and institutional projects.

    View all Holder Construction jobs
    Industry
    Construction
    Founded
    1968
    Open roles
    301

    Interested in this role?

    Apply with HireFT

    Free to start — no card required.

    Your fit

    How well do you match?

    Sign in to see how your résumé lines up with this role.