1.Prepare rubber hoops with thicknesses and dimensions proportional to the thickness and dimensions of the acrylic sheets being cast.
2.Inspecting glass panels and removing damaged ones
3.Installing rubber collars on glass panels
4.Installing clamps on a glass panel frame prepared for injecting the material
5.Injecting the material into the glass plate
6.Distribute the material by pressing the glass panels to facilitate its spread in the space prepared for casting
Job details are sourced from the employer's original posting.
Open job postingAbout the company
Ideal Standard International Egypt Sanitary Wares SAE is a company operating in the sanitary ware industry.