HireFT
Browse JobsHow it worksPricingSuccess Stories
    Back to jobs
    IN

    Interplay Learning Inc.

    EdTech / Skilled Trades Training

    SME Consultant - Data Center Construction

    Any, United StatesRemoteContract$50 – $75 / hourPosted 2mo ago
    All Interplay Learning Inc. jobs

    Job description

    Interplay Learning, the leader in immersive learning for the skilled trades, now includes Industrial Training International (ITI), the global leader in specialized industrial learning solutions. 

    Leveraging instructor-led training, online simulations, AI, and VR, Interplay helps organizations and educational institutions upskill faster, reduce risk, and increase operational readiness. With nearly 600,000 people trained, Interplay is shaping the future of workforce development, building better careers and better lives. 

    Visit www.interplaylearning.com to learn more.

    Awards & Recognition: 

    • 2025, Forbes,  America’s Best Startup Employers
    • 2025, Inc. 5000, Fastest-Growing U.S. Companies
    • 2024, Best Midsize Places to Work In Austin
    • 2024, Facilitiesnet Readers' Choice Award Winners for Software
    • 2024, AHR Expo Innovation Awards Winners for Software

    Interplay Learning Ethos:

    At Interplay, we love what we do. We embrace our daily challenge to push technological limits to invent better ways to make learning easier and training more powerful. We attract passionate people and invite spirited discourse. We celebrate that our jobs fit our lives, not the inverse. We are uncompromising in our belief that together: we can build better training, build better careers and build better lives for customers and our team.

    Position: SME Consultant (Data Center Construction)

    Pay: $50-75/hr (1099)

    Please note this is an hourly contract position with variable hours and is not eligible for company benefits. Work is 100% remote.  Some availability during business hours is needed to attend scheduled Zoom meetings.

    SMEs serve as advisors to Interplay and play a key part of our growth by helping us build industry-leading training content to advance the data center industry.

    At this time, we are looking for subject matter experts with direct data center construction expertise in one or more of the following areas:

    • Electrical
      • Install switchgear, transformers, generators, UPS systems, power distribution units, busways, panels, grounding, lighting, and receptacles.
    • Network and fiber 
      • Install structured cabling, fiber-optic cable, telecommunications systems, access control, cameras, alarms, and building controls.
      • Terminate, splice, test, label, and certify connections between equipment rooms, racks, and network infrastructure.
    • Rack Installation
      • Assemble, position, anchor, bond, align, and label server racks, install rack accessories and prepare them for power, cabling, and IT equipment.
    • HVAC
      • Install chillers, cooling towers, air-handling units, computer room air conditioners, pumps, piping, ventilation, and controls.
    • Plumbing and Pipefitting
      • Install domestic water, drainage, fuel-gas piping, condenser-water piping, chilled-water piping, and equipment connections.

    You will play a critical role on the Production Team, working with designers & developers to create and review content for skilled trades training.

    Why this position:

    • Flexible work hours, remote work
    • Use your expertise to make an impact and provide education
    • Collaborative, supportive team

    What you'll do:

    • Advise internal teams on industry dynamics and best practices
    • Use your expertise to support content development for VR simulations and eLearning videos
    • Advise on construction and installation
    • Develop and assist in the creation of procedure guides
    • Write and record voiceover scripts and screencasts for videos 
    • Generate valid and reliable test questions/knowledge checks
    • Develop fault scenarios
    • Review courses for accuracy

    Who you are:

    • Extensive knowledge of Data Center Construction
    • Teaching or training experience is preferred
    • Organized and communicative with the team
    • Desire and ability to collaborate with designers and developers and respond to queries and feedback within 1-2 business days

    Requirements:

    • Extensive knowledge of subject matter
    • Systematic approach to troubleshooting
    • Research skills
    • Teaching, training or mentoring experience is ideal
    • Computer skills - G-Suite (Google Docs, Sheets, Slides)
    • Camtasia (video tutorial and presentation software), will teach
    • Writing skills for knowledge checks and procedure guides
    • Availability during business hours to attend scheduled Zoom meetings
    • We may ask you to record a video intro for the hiring team if your application looks like a potential match. Instructions will be sent.

    Equal Employment Opportunity

    Interplay Learning is committed to providing equal employment opportunity (EEO) to all qualified employees and applicants for employment without regard to race, color, religion, gender, sexual orientation, national origin, age, disability, pregnancy, marital status, gender identity or expression, status as a veteran, or any other legally protected characteristic or activity in accordance with applicable federal, state and local laws.

    As a federal contractor, Interplay Learning takes affirmative action to consider qualified individuals without regard for disability and protected veterans status.

    Individuals with disabilities who need assistance with the application or recruitment process must promptly contact the HR Department to discuss their particular needs.

    Interplay Learning does not discriminate against employees or applicants for discussing, disclosing, or inquiring about compensation.

    We believe in fostering a welcoming and inclusive workplace and encourage everyone to apply, regardless of background.

    Our hiring decisions are guided by skills, experience, and a shared commitment to our values. If you have any questions about our process, we’re happy to provide support and guidance along the way.

    Job details are sourced from the employer's original posting.

    Open job posting
    IN

    About the company

    Interplay Learning Inc.

    Interplay Learning provides online, hands-on training for skilled trades, including HVAC, electrical, plumbing, and solar.

    View all Interplay Learning Inc. jobs
    Industry
    EdTech / Skilled Trades Training
    Open roles
    4

    Interested in this role?

    Apply with HireFT

    Free to start — no card required.

    Your fit

    How well do you match?

    Sign in to see how your résumé lines up with this role.