HireFT
Browse JobsHow it worksPricingSuccess Stories
    Back to jobs
    LU

    Lunda Construction

    Heavy Civil Construction

    Scheduler - Heavy Civil Construction

    Lunda Regional Office Rosemount/Coates - Rosemount, MN 620071, United StatesFull-time5+ yrs experience$105k – $188kPosted 1mo ago
    All Lunda Construction jobs

    Job description

    The expected salary range for this position is $105,000 - $188,000 depending on experience.

    This position is required to be on-site, Monday through Friday.

    NO STAFFING AGENCY CANDIDATES WILL BE CONSIDERED FOR THIS POSITION

    Applicants must be eligible to work in the United States without visa sponsorship now or in the future.

    Lunda Construction, a Tutor Perini Company, is seeking Scheduler to join our office in either Rosemount, MN or Milwaukee, WI.

    About Lunda Construction:

    Excellence in Construction since 1938

    Lunda Construction is a major heavy/highway, civil and industrial general contractor with an uncompromising pledge to achieve the highest standards of Engineering and Excellence, with the Safety of the workforce and traveling public being the highest priority.

    Building isn’t just a job. At Lunda Construction, it is our passion. With every project we undertake, we set the bar high and provide the best people in the industry, with a true love of what we do to make our customers vision a reality.  From inception to completion, we use the latest techniques and technologies to make sure that the project stays on point and on budget. Even after a project's completion, our post-construction teams work to ensure that our customers are satisfied.

    At Lunda Construction, we believe our work stands as a testament to the quality and excellence that we stand for as a company. Notable projects include the Southwest METRO Green Line Extension, I-74 Mississippi River Bridge, Saint Croix Crossing, Marquette Interchange, I-494 Airport to Highway 169 Design-Build, and the Southwest LRT Blue Line Extension.

    Extraordinary Projects, Exceptional Performance

    DESCRIPTION:

    As a Scheduler at Lunda Construction, you will play a key role in planning and managing schedules for complex heavy civil projects. In this role, you will:

    • Develop and maintain project schedules for all phases—from pre-construction through close-out.

    • Track, update, and report on schedule progress, performance, and potential delays.

    • Collaborate with construction and project management teams to ensure schedule accuracy and alignment with project objectives.

    • Create schedule fragments and incorporate them into the master schedule for time impact analyses and scenario studies.

    • Prepare and analyze time impact assessments for completed, ongoing, and upcoming work.

    • Facilitate pull-planning sessions with field teams, consultants, and subcontractors.

    • Lead schedule review meetings with field and project management teams.

    • Gather data from project logs (Change Orders, Procurement, Submittals, RFIs, Billings/Requisitions, Commissioning, Close-out, etc.) and integrate into the schedule.

    • Prepare, review, and deliver project schedule reports.

    • Support earned value analysis (EVM), cost/resource loading and modeling, claims, and other scheduling-related tasks as needed.

    Requirements

    • Bachelor’s degree in Engineering, Architecture, or Construction Management from an accredited institution.

    • 5+ years of scheduling experience on heavy civil construction projects (roads, bridges, tunnels, dams, rail, utilities, etc.).

    • Proficiency with Primavera P6 and Excel.

    • Experience with public projects such as infrastructure, water/wastewater, buildings, or commercial construction is preferred.

    • Strong leadership, communication, and team collaboration skills.

    • Ability to manage multiple tasks concurrently

    OUR MISSION

    We build critical infrastructure that creates a better world.

    OUR VISION

    We strive to be the preeminent full-service civil, building, and specialty contractor by delivering innovative, transformative projects through world-class execution. We are committed to creating lasting value for our customers, upholding the highest standards of safety and integrity, generating exceptional financial results and shareholder value, and fostering a culture where our employees thrive.

    Lunda Construction builds extraordinary projects, which need exceptional talent.  Join us, to help build the critical infrastructure that creates a better world.

    Equal Opportunity Employer

    Job details are sourced from the employer's original posting.

    Open job posting
    LU

    About the company

    Lunda Construction

    Lunda Construction is a heavy civil construction company specializing in infrastructure projects.

    View all Lunda Construction jobs
    Industry
    Heavy Civil Construction
    Open roles
    19

    Interested in this role?

    Apply with HireFT

    Free to start — no card required.

    Your fit

    How well do you match?

    Sign in to see how your résumé lines up with this role.