HireFT
Browse JobsHow it worksPricingAboutSuccess Stories
    Back to jobs
    TU

    Turner Construction

    Construction

    Scheduling Manager (Kansas City)

    Kansas City, United StatesHybridFull-timePosted 2w ago
    All Turner Construction jobs

    Job description

    This role may require travel and location flexibility. While candidates local to the Kansas City area are encouraged to apply, initial project assignments may be outside the Kansas City metro. Project locations will vary based on business needs, and applicants should be open to traveling or working in different locations as required.

    ****Experience in one or more of the following market sectors is preferred: data centers (mission critical), healthcare, sports/entertainment, or light industrial facilities. Candidates with transferable experience from similarly complex construction environments will also be considered.****

    If you picture yourself doing great things that make a difference in the lives of others, Turner is the place to be. Turner Construction is an industry leading commercial construction general contractor with a 120-year history spanning iconic projects around the globe, including 10 of the world's 100 tallest buildings.

    For more than 30 years, Turner's Kansas City office has helped shape our local skyline with projects such as Arrowhead Stadium, Children's Mercy Park, and the University of Kansas Hospital Physicians Medical Office Building. Kansas City’s current working portfolio includes everything from data centers and elaborate healthcare renovations to elementary schools.
    Turner is committed to sustaining a diverse, equitable, and inclusive environment where everyone feels connected, sees themselves represented at all levels of the company, and feels supported to reach their ultimate potential. Turner builds some of the most ambitious projects in the world. The technical expertise of our people makes us a recognized leader in many markets. Our projects are well known. Our people set us apart. We inspire greatness. Can you picture yourself at Turner? If so, apply and let’s do great things together!
    This is not a remote/hybrid position and will be based in a Turner office or project location.'

    Position Description: Oversee work of Scheduling team, project staff, or consultants assigned to scheduling function, on one or more construction projects of varying size and complexity for Business Unit. Prepare and maintain schedules, develop and review project baseline, and monitor and track scheduling project progress.

    Essential Duties & Key Responsibilities:

    • Conduct scheduling activities while leading, managing, and supervising project scheduling activities of Scheduling group (e.g., Scheduling Engineers, project staff, or consultants) assigned to scheduling function on one or more construction projects of varying size and complexity throughout Business Unit (BU).
    • Perform Scheduling activities including monitoring, tracking progress, and preparing summary and detail level schedules.
    • Develop full Critical Path Method (CPM) logic-generated baseline schedules for projects,
    • Communicate project execution plan, monitor performance against original baseline schedule and previous month’s forecasts, and promote early identification and mitigation of risks.
    • Develop construction schedule throughout all project phases, including RFP/Project Launch through Substantial Completion/Final Turnover.
    • Collaborate with project departments (e.g., Preconstruction, Commissioning, Procurement, Construction) to prepare detailed schedules.
    • Collaborate with VDC to integrate BIM, 4D models, and logistics planning.
    • Integrate LPS (Last Planner System) methodology into construction project schedule.
    • Perform monthly progress updates complete with narrative and create target comparison and periodic look-ahead schedules.
    • Develop and update cost and/or resource loaded schedules.
    • Conduct project schedule reviews with project leadership and provide Scheduling Dashboard statistics at Operations Review Meetings (ORMs) or other sessions (e.g., Pull Plan Sessions, Trade contractor meetings).
    • Participate in Business Development (BD) and BU marketing activities for proposal presentations and activities as related to project scheduling and provide scheduling contract language and related documentation.
    • Provide support and training of scheduling software and planning and scheduling techniques to project and office employees.
    • Develop and maintain relationships with project stakeholders to promote value of scheduling and communication of overall project plan.
    • Engage with clients as Planning and Scheduling SME (subject matter expert) to educate and influence expectations for Planning and Scheduling standards, and best practices to satisfy owner standards and other requirements.
    • Conduct project site progress walks to capture progress, review and verify with project team, and update schedule accordingly.
    • Challenge project team based on previous, current, and future schedule data for As Built vs. Planned progress to ensure logical construction sequencing.
    • Perform audits of project schedules using diagnostic and comparison software to validate health and quality of schedule, Last Planner System integration, and review risk/gap analysis of scheduling function across projects. Provide feedback to Scheduling group to mature scheduling practices.
    • Implement and educate Scheduling group to use advanced techniques (e.g., weather conditions, TIAs (Time Impact Analysis), cost and resource loading) to identify potential schedule risks and delays.
    • As required, provide historical schedule information to defend against or initiate a claim.

    #LI-ND1

    Job details are sourced from the employer's original posting.

    Open job posting
    TU

    About the company

    Turner Construction

    Turner Construction is a construction management company that provides general contracting, construction management, and design-build services.

    View all Turner Construction jobs
    Industry
    Construction
    Open roles
    989

    Interested in this role?

    Apply with HireFT

    Free to start — no card required.

    Your fit

    How well do you match?

    Sign in to see how your résumé lines up with this role.