HireFT
Browse JobsHow it worksPricingSuccess Stories
    Back to jobs
    VA

    Vanir Construction Management, Inc.

    Construction Management

    Senior Regional Construction Scheduler

    Los Angeles, United StatesOn-SiteFull-time10+ yrs experience$140k / yearPosted 2mo ago
    All Vanir Construction Management, Inc. jobs

    Job description

    About Vanir

    Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and real estate development. Since 1964, we have consistently exceeded client expectations. Ranked as a top PMCM firm by Engineering News-Record (ENR) for more than three decades, our award-winning team provides a full range of services to public and private sector clients in the aviation; healthcare; education (K-12 and higher); justice and essential services; science and technology; state and local government; transportation; water and wastewater; energy; and commercial, residential and nonprofit markets.

    Job Description

    Essential Duties & Responsibilities:

    • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide variousschedule-related reports for upper management to meet Key Performance Milestones.
    • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
    • Independently interpret and read detailed construction drawings (Architectural, Structural,Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
    • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based onstructured review templates.
    • Review multiple Contractor P6 Monthly schedule updates and provide written schedule reviewcomments that document milestone schedule slippage, critical path activity slippage, and provideover-all schedule analysis based on structured review templates.
    • Perform schedule Time Impact Analysis by using the method of Windows Analysis whileincorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
    • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
    • Effectively communicate with the project team regarding any schedule/progress related issues orconcerns at regular schedule meetings.
    • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
    • Perform status updates for Program Schedules/Master Schedules on a regular basis.
    • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure dataintegrity.
    • Prepare reports as needed and directed by Senior Management.
    • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthlyschedule progress.

    Minimum Qualifications:

    • Graduation from a recognized college or university with a bachelor’s degree in constructionmanagement, engineering, architecture or any related field
      • OR Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four (4) years of experience in the duties to compensate forthe required education.
    • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects
    • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
    • Excellent written and verbal communication skills
    • Superior organizational and planning skills
    • Ability to build efficient working relationships with project teams and department staff
    • Understanding of theories, principles and practices of cost engineering, scheduling and scheduleforensics

    Benefits

    Vanir offers a comprehensive, competitive benefits package that includes 401(k) Savings with employer matching contributions, medical, dental, vision, health savings account (HSA) with employer contributions, life, AD&D and disability benefits, flexible spending account (FSA), voluntary benefits, Teladoc, pet insurance, paid time off, national employee assistance program (EAP) and employee referral program.

    How to Apply

    If you're interested in working for Vanir please visit our website to learn more and to apply online at www.vanir.com.

    VEVRAA Federal Contractor

    Request Priority Protected Veteran Referrals

    EOE Minorities/Females/Protected Veterans/Disabled

    Contact Email: [email protected]

    Persons with medical limitations may, with reasonable accommodations, be capable of performing the duties of this position. Such a determination must be made on an individual basis considering the person's limitations, the requirements of the position, and the company's ability to make reasonable accommodations to the person's limitations.

    We Participate in E-Verify

    Pursuant to the Ban The Box Act/Fair Chance Initiative, we will consider for employment qualified applicants with arrest and conviction records.

    #LI-JB1

    Posted Salary Range

    USD $140,000.00 - USD $159,250.00 /Yr.

    Job details are sourced from the employer's original posting.

    Open job posting
    VA

    About the company

    Vanir Construction Management, Inc.

    Vanir Construction Management, Inc. is a construction management firm that provides services for public and private sector projects.

    View all Vanir Construction Management, Inc. jobs
    Industry
    Construction Management
    Open roles
    41

    Interested in this role?

    Apply with HireFT

    Free to start — no card required.

    Your fit

    How well do you match?

    Sign in to see how your résumé lines up with this role.